For the Tisová power plant and the Tušimice 1 and Tušimice 2 power plants, which are part of the ČEZ Group, we supplied a measurement and control solution for 16 secondary heat exchange stations. Our task was also to carry out a complete reconstruction of the main steam/water exchange station.

The project also involved an implementation of data transmissions from the receiving points located around the surface mine Nástup Tušimice to the central control room, including data visualisation.

The RESCOM company carried out electrical installation on the above-mentioned project in the scope of high-voltage electrical installation and a set of measurement and control equipment. The central heat exchange station Tisová serves for production and distribution of hot water in the area along the Tisová–Bukovany–Habartov distribution line. The work was completed in time, in the required quality, and with professional expertise.